AHM Formworks — Home
Mobile tunnel formwork for the Highway 1 widening and upgrade between Jerusalem and Tel Aviv

About · Since 1985

Steel formwork for concrete casting, designed and manufactured

AHM Formworks has been designing and manufacturing steel formwork for concrete casting since 1985, for bridges, tunnels, infrastructure and ports, and for precast plants. Every formwork is engineered around the project's requirements, the element being cast and the casting method.

Key facts

Formwork design & manufacturing
Since 1985
Projects delivered in Israel
500+
Computer-controlled manufacturing
CNC
Pictured: Harel Tunnel

Who we are

AHM Formworks designs and manufactures steel formwork for concrete casting, including complete systems for precast element production. Our work covers:

  • Formwork lines for serial production.
  • Mobile and climbing tunnel formwork.
  • Purpose-built formwork for infrastructure and construction projects.

We work with contractors, engineers, precast manufacturers and architects. Our clients include Israel Railways, Ashtrom Group, Ackerstein Industries, Itong, Ramat Trom, Readymix and Electra Infrastructure.

From specification to delivery

Our engineering department, a team of engineers and consultants, takes every project through each stage:

  1. Specification

    Defining the project, the elements and the requirements. A completion target is set at this stage, based on the type of project.

  2. Engineering design

    Formwork design in dedicated design software, to the standards that apply to the project.

  3. Design for manufacturing

    Turning the engineering design into production drawings.

  4. Bills of quantities and estimates

    Prepared as part of project planning.

  5. Manufacturing

    CNC cutting, bending, rolling, welding and metalworking.

  6. Support through casting, assembly and delivery

    Involvement in casting and assembly methods, through to handover of the formwork.

Formwork types and systems

  • Mobile and climbing tunnel formwork

    • Mobile tunnel formwork for the Highway 1 widening (Harel Tunnel).
    • Climbing tunnel formwork for the Nation Buildings underground project in Jerusalem.
    • Formwork for an access tunnel on Route 60.
  • Precast formwork for bridges and ports

    • Precast elements for the Motzaa Bridge.
    • Bridge pier bases.
    • Beams for the new Haifa Port dock.
    • Beams for Navy piers.
    • Protective walls at Ashdod Port.
  • Formwork lines for serial production

    • Railway ties.
    • Road separation barriers.
    • Slotted drains.
    • Jacking pipes.
    • Water channel elements.
  • Underground shafts and chambers

    • Jerusalem Light Rail shafts.
    • Communication chambers in every size.
    • Electrical shafts.
    • Underground waste chambers.
  • Battery and modular formwork

    • Book-type (battery) formwork for precast wall panels.
    • Modular formwork for T9 protection wall elements.
    • Shelter formwork, adapted to each project.
  • Special beams and architectural elements

    • Formwork for 24-metre protective beams.
    • Tribune formwork for Sami Ofer Stadium.
    • Architectural arches for public buildings.
    • The Gav Yam Building in Holon.
  • Precast plant equipment

    • Polished casting tables.
    • Lifting rigs for turning precast elements.
    • Metal roofs for prefabricated buildings.

Manufacturing and technologies

Manufacturing is based on computer-controlled metalworking, built to our engineering department's drawings. That covers anything from a single formwork for a one-off element to a complete formwork line for serial production.

  • CNC cutting
  • Bending
  • Rolling
  • Sheet metal work
  • Welding
  • Milling
  • Turning
  • Drilling
  • Punching

Clients

  • Israel Railways
  • Ashtrom Group
  • Ackerstein Industries
  • Readymix
  • Itong
  • Sela
  • New Way
  • Sibuos Rimon
  • Ramat Trom
  • Sham Arika
  • Ashkelon Municipality
  • ElectRoad

How we work

  1. Design before manufacturing

    Every formwork is engineered by our engineering department to the project's requirements and the applicable standards before it goes into production.

  2. A schedule set up front

    The completion target is set at the specification stage, based on the type of project.

  3. Coordination with the project team

    Design is coordinated with the project's contractor, engineer and architect.

  4. Support through handover

    Our engineering team stays involved in casting and assembly methods until the formwork is handed over.

Have a project that needs formwork?